Shahid Abaspour Dam   Dez Dam

The generated energy of powerplant of Shahid Abaspour dam in 1380(2001) equaled 2792() , which in comparison with the some period in the previous year indicates an increase of 23 percent . Of the amount of generated , 23 percent has been consumed internally by powerplant , and the rest , which equals 2786() , has been delivered to the transmission network . The Share of this powerplant from the total net generated energy in Khuzestan network has been 16 percent .

 

The generated energy of powerplant of dez dam in 1380( 2001 ) equaled 1883() , which in comparison with the period in the previous year indicates an increase of 41 percent . Of the amount of generated , 36 percent has been consumed internally by powerplant , and the rest , which equals 1876() , has been delivered to the transimission network . The share of this powerplant from the total net generated energy in Khuzestan network has been 11 percent .

 
Dam Name Maximum hight(m) Minimum hieght(m) Average in-flow
Average turbine out-flow
Rate of
out-flow to generation

Abas
pour
532 509 338 265 2952
Dez 435 312 217 171 2827
 
Dez Powerplant
 
 