Previous   Next   Table of Contents  
       


Load duration curve is achieved by rotating hourly load from maximum amount to minimum , and indicates the load variations in a period of time which shows the percentage of time used for each load range .
Considering the upper definition in this section Khuzestan network load duration curves for spring-summer-autumn-winter , the load duration curve in peak load day of 1380(2002) , and annual load duration curve are drown and analyzed separately .

 

 

 

 
 

 

 
 
    Previous Next Table of Contents Power Department Home Page    
  Copyright ©2003 Khuzestan Water & Power Authority. All rights reserved.
Designed by Parna Co.