1380(2001) ended successfully , the main aspects of which are listed in Table(68) . Now at the threshold of the third year of the third development plan , we take a short look at the future of power industry to the end of the fourth development plan in 1388(2009) :


During the third and fourth development plan , and by the end of 1388(2009) , 8540MW will be added to the current power of Khuzestan network powerplants , 7416MW of this amount belongs to the big plans of hydro-electric powerplants , 630MW belongs

 
 

to the development plan of the 7th and 8th units of Ramin thermal powerplant and the remaining 494MW belongs to installation of 4 gas units of Abadan . So by considering the powerplant underway projects , the total generation capacity of Khuzestan powerplant will reach to 12369MW by the end of the fourth development plan.


Description Unit Amount
Rated power MW 3828
Operational power MW 3544
Length of 400KV transmission lines Km/circuit 728
Length of 230KV transmission lines Km/circuit 2029
Length of 132KV subtransmission lines Km/circuit 2453
The capacity of 400KV substations MVA 2450
The capacity of 230KV substations MVA 5518
The capacity of 132KV substations MVA 4836
Length of medium voltage distribution lines Km/circuit 14168
Length of low voltage distribution lines Km/circuit 10340
The capacity of distribution substations MVA 5956
Maximum simultaneous load MW 3147
Annual energy generation MWh 17103
Number of clients Client 788655
Number of power supplied villages Village 4673
 