1380(2001) ended successfully , the main aspects of which are listed
in Table(68) . Now at the threshold of the third year of the third
development plan , we take a short look at the future of power
industry to the end of the fourth development plan in 1388(2009) :
During the third and fourth development plan , and by the end of
1388(2009) , 8540MW will be added to the current power of Khuzestan
network powerplants , 7416MW of this amount belongs to the big plans
of hydro-electric powerplants , 630MW belongs
|
|
to the development plan of the 7th and 8th units of Ramin thermal
powerplant and the remaining 494MW belongs to installation of 4 gas
units of Abadan . So by considering the powerplant underway projects
, the total generation capacity of Khuzestan powerplant will reach
to 12369MW by the end of the fourth development plan.

|
Rated power |
MW |
3828 |
|
Operational power |
MW |
3544 |
|
Length of 400KV
transmission lines |
Km/circuit |
728 |
|
Length of 230KV
transmission lines |
Km/circuit |
2029 |
|
Length of 132KV subtransmission lines |
Km/circuit |
2453 |
|
The capacity of 400KV
substations |
MVA |
2450 |
|
The capacity of 230KV
substations |
MVA |
5518 |
|
The capacity of 132KV
substations |
MVA |
4836 |
|
Length of medium voltage
distribution lines |
Km/circuit |
14168 |
|
Length of low voltage
distribution lines |
Km/circuit |
10340 |
|
The capacity of
distribution substations |
MVA |
5956 |
|
Maximum simultaneous load |
MW |
3147 |
|
Annual energy generation |
MWh |
17103 |
|
Number of clients |
Client |
788655 |
|
Number of power supplied
villages |
Village |
4673 |
|